Ramp PR60 to PR198 over Humacao River
Humacao Municipio, Puerto Rico · rated Poor in the 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
FairPoor Faded: the 10 nearest inventoried bridges in Humacao Municipio.
- Ramp PR60 to PR198 over Humacao River in Humacao Municipio, Puerto Rico, is rated in poor condition in the 2025 National Bridge Inventory (as of ).
- Its lowest-rated component is the substructure, rated 4 (poor condition) on the 0-9 scale.
- It was built in 1985, making it 40 years old at the 2025 inventory.
- It carries about 29,200 vehicles a day (traffic count year 2017).
- Its listed owner is the state highway agency.
- It is one of 10 of the 68 inventoried bridges in Humacao Municipio rated poor (14.7%); 10 (14.7%) are rated poor.
- Its traffic status in the 2025 inventory is open, no restriction (NBI item 41).
- It was rated fair in the 2024 inventory and is now poor (deck 6 to 5, substructure 5 to 4).
- Its most recent inspection on record is dated October 2024, on a 6-month routine inspection cycle.
- It is coded scour critical (NBI item 113 = 2): scour critical: extensive scour observed, foundations unstable.
- A poor rating means at least one major component - deck, superstructure, or substructure - is rated 4 or lower on FHWA's 0-9 scale. It does not by itself mean the bridge is unsafe; bridges judged unsafe are closed or load-restricted by their owners.
Open this bridge in Google Maps → (18.15644, -66.8375)
Component ratings
| Component | Rating (2024) | Rating (2025) | FHWA scale meaning |
|---|---|---|---|
| Deck | 6 | 5 | Fair condition |
| Superstructure | 7 | 7 | Good condition |
| Substructure | 5 | 4 | Poor condition |
Bridge details
| Structure | Prestressed concrete stringer or multi-beam girder |
| Length | about 294 ft |
| Location | 1 Km Northwest of Humacao |
| NBI structure number | 018261 |
| Condition class | Poor |
| Traffic status (item 41) | Open, no restriction |
| Last inspection (item 90) | October 2024 |
| Inspection interval (item 91) | 6 months |
| Scour (item 113) | 2: scour critical: extensive scour observed, foundations unstable |
Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.
Busiest bridges in Humacao Municipio
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 30 25.7 Km over Pr 60 0.3 Km | 1975 | 60,700 | Poor |
| Pr 30 Km 27.2 over Pr 908 Km 0.6 | 1976 | 41,100 | Fair |
| Pr 30 27.8 Km over Pr 909 0.3 Km | 1976 | 41,100 | Poor |
| Pr 30 28.6 Km over Pr 3 | 1993 | 41,100 | Fair |
| Pr 30 over Dirt Road | 1995 | 41,100 | Fair |
| Pr 30 29.6 Km over DIRT ROAD & WATERWAY | 1995 | 41,100 | Poor |
All bridges nearby: Humacao Municipio, PR bridge conditions · every bridge in Humacao Municipio · Puerto Rico bridges.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.