Bridge conditions in Humacao Municipio, Puerto Rico
68 inventoried bridges · 0 closed · 8 posted · 10 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 68 bridges.
Humacao Municipio has 10 bridges rated poor out of 68 inventoried, a 14.7% share that puts it well above the national rate of about 7%.
- 10 of the 68 bridges in Humacao Municipio, Puerto Rico, are rated in poor condition (14.7%) in the 2025 National Bridge Inventory, as of .
- Humacao Municipio has no bridges closed to all traffic and 8 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 1 more bridge is open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 1 bridge dropped into poor condition and no bridges improved out of it; 16 bridges had at least one major component rating lowered, 1 newly load-posted.
- Inspection dates on record run from February 2023 to December 2024; 7 bridges over water are coded scour critical.
- 17 bridges (25.0%) are rated good and 41 (60.3%) fair.
- The median Humacao Municipio bridge was built in 1993.
- The busiest poor-rated bridge is Pr 30 25.7 Km over Pr 60 0.3 Km (built 1975), carrying about 60,700 vehicles a day.
What this page is: the federal bridge inspection inventory for Humacao Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 25.0% · Fair 60.3% · Poor 14.7% of 68 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Ramp PR60 to PR198 over Humacao River | fair to poor; deck 6 to 5; substructure 5 to 4 | Fair | Poor | 29,200 |
| Pr 60 0.60 Km over Pr 198 13 Km | newly posted for load; superstructure 5 to 4 | Poor | Poor | 14,600 |
| Pr 53 Northbound over Dirt Road | good to fair; superstructure 7 to 6 | Good | Fair | 20,400 |
| Pr 923 4.4 Km over Humacao River | good to fair; deck 7 to 6 | Good | Fair | 3,900 |
| Pr 30 25.7 Km over Pr 60 0.3 Km | deck 4 to 3 | Poor | Poor | 60,700 |
| Pr 60 0.70 Km over PR 198 & HUMACAO RIV | superstructure 5 to 4 | Poor | Poor | 14,600 |
| Off Pr 910 0.6 Km over Los Pajaros Creek | superstructure 5 to 4 | Poor | Poor | 1,000 |
| Pr 30 Eabd 25.3 Km over Pr 914 0.1 Km | superstructure 6 to 5; substructure up 5 to 6 | Fair | Fair | 30,350 |
| Pr 53 27.1 Km over Anton Ruiz River | deck 6 to 5 | Fair | Fair | 15,100 |
| Pr 53 Sobd 31.7 Km over Pr 923 Hum.river Creek | deck 7 to 6; superstructure 7 to 6; substructure 6 to 5 | Fair | Fair | 10,200 |
| Pr 53 Nobd 31.7 Km over Pr 923 5.5 Km | deck 7 to 6; superstructure 7 to 6; substructure 6 to 5 | Fair | Fair | 10,200 |
| Fe Street 0.2 Km over Humacao River | deck 6 to 5 | Fair | Fair | 950 |
| Pr 30 over Dirt Road | substructure 7 to 6 | Fair | Fair | 41,100 |
| Pr 60 2.7 Km over Pr 924 0.9 Km | superstructure 7 to 6 | Fair | Fair | 34,900 |
| Pr 60 1.5 Km over Local Road | superstructure 7 to 6 | Fair | Fair | 33,600 |
| Pr 53 over Fronteras Creek | substructure 8 to 7 | Good | Good | 17,800 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 53 24.8 Km over Unknown Creek | fair to good; culvert up 6 to 7 | Fair | Good | 20,100 |
| Pr 3 over CATAÑO Creek | load posting removed | Fair | Fair | 14,700 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 60 0.60 Km over Pr 198 13 Km | posted for load | 1965 | 14,600 | September 2024 | Poor |
| Pr 60 0.70 Km over PR 198 & HUMACAO RIV | posted for load | 1966 | 14,600 | September 2024 | Poor |
| Pr 908 over Mariana Creek | posted for load | 1984 | 9,300 | February 2023 | Fair |
| Pr 924 5.2 Km over Mambiche Blanco Creek | posted for load | 1971 | 7,600 | July 2024 | Fair |
| Pr 924 0.5 Km over Mabu Creek | posted for load | 1967 | 7,500 | July 2024 | Fair |
| Pr 3 Km 88.6 over Candelero River | posted for load | 1926 | 7,100 | December 2023 | Fair |
| Off Pr 910 0.6 Km over Los Pajaros Creek | posted for load | 1960 | 1,000 | February 2024 | Poor |
| 4th STREET over Los Muertos Creek | posted for load | 1964 | 650 | November 2024 | Fair |
| Pr 3 over CATAÑO Creek | open, posting recommended | 1928 | 14,700 | July 2023 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 11 on 12 months or less, 57 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Humacao Municipio is dated December 2024; 46 bridges have an inspection dated in 2024.
Scour critical (item 113): 7 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 2 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Ramp PR60 to PR198 over Humacao River | open | 1985 | 29,200 | October 2024 | Poor |
| Pr 3 over CATAÑO Creek | open, posting recommended | 1928 | 14,700 | July 2023 | Fair |
| Pr 924 over Mambiche Creek | open | 1957 | 13,400 | September 2024 | Fair |
| Pr 3 Km 88.6 over Candelero River | posted for load | 1926 | 7,100 | December 2023 | Fair |
| Pr 914 over Humacao River | open | 1952 | 1,400 | September 2024 | Fair |
| Off Pr 910 0.6 Km over Los Pajaros Creek | posted for load | 1960 | 1,000 | February 2024 | Poor |
| Off Pr 924 over Collores Creek | open | 1996 | 400 | September 2024 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 30 25.7 Km over Pr 60 0.3 Km | 1975 | 60,700 | Poor |
| Pr 30 27.8 Km over Pr 909 0.3 Km | 1976 | 41,100 | Poor |
| Pr 30 29.6 Km over DIRT ROAD & WATERWAY | 1995 | 41,100 | Poor |
| Pr 60 over LOCAL ROAD & MABU CR | 1990 | 33,600 | Poor |
| Pr 30 Wsbd 25.3 Km over Pr 914 0.1 Km | 1965 | 30,350 | Poor |
| Ramp PR60 to PR198 over Humacao River | 1985 | 29,200 | Poor |
| Pr 60 0.60 Km over Pr 198 13 Km | 1965 | 14,600 | Poor |
| Pr 60 0.70 Km over PR 198 & HUMACAO RIV | 1966 | 14,600 | Poor |
| Off Pr 910 0.6 Km over Los Pajaros Creek | 1960 | 1,000 | Poor |
| M Cslls St 0.05 Km over Los Muertos Creek | 1975 | 650 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 30 25.7 Km over Pr 60 0.3 Km | 1975 | 60,700 | Poor |
| Pr 30 Km 27.2 over Pr 908 Km 0.6 | 1976 | 41,100 | Fair |
| Pr 30 27.8 Km over Pr 909 0.3 Km | 1976 | 41,100 | Poor |
| Pr 30 28.6 Km over Pr 3 | 1993 | 41,100 | Fair |
| Pr 30 over Dirt Road | 1995 | 41,100 | Fair |
| Pr 30 29.6 Km over DIRT ROAD & WATERWAY | 1995 | 41,100 | Poor |
| Pr 30 over Pr 53 | 1997 | 41,100 | Good |
| Pr 60 North Bypass over Los Sauces Street | 1986 | 34,900 | Fair |
| Pr 60 2.7 Km over Pr 924 0.9 Km | 1986 | 34,900 | Fair |
| Pr 60 over LOCAL ROAD & MABU CR | 1990 | 33,600 | Poor |
Frequently asked questions
Are any bridges closed in Humacao Municipio, Puerto Rico?
No bridges of the 68 in Humacao Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 8 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Humacao Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Humacao Municipio: no bridges with a component rated 2 (critical) or lower, 10 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.
When were bridges in Humacao Municipio last inspected?
Inspection dates in the 2025 inventory for Humacao Municipio run from February 2023 to December 2024. Intervals: 11 on 12 months or less, 57 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Humacao Municipio → - all 68, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.