BridgeReportCard
Home › Puerto Rico › Humacao Municipio

Bridge conditions in Humacao Municipio, Puerto Rico

68 inventoried bridges · 0 closed · 8 posted · 10 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 68 bridges.

Humacao Municipio has 10 bridges rated poor out of 68 inventoried, a 14.7% share that puts it well above the national rate of about 7%.

What this page is: the federal bridge inspection inventory for Humacao Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 25.0% · Fair 60.3% · Poor 14.7% of 68 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

1
dropped into poor
since 2024
0
improved out of poor
since 2024
16
had a rating lowered
deck, superstructure, substructure or culvert
1
newly closed or posted
0 closed, 1 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Ramp PR60 to PR198 over Humacao Riverfair to poor; deck 6 to 5; substructure 5 to 4FairPoor29,200
Pr 60 0.60 Km over Pr 198 13 Kmnewly posted for load; superstructure 5 to 4PoorPoor14,600
Pr 53 Northbound over Dirt Roadgood to fair; superstructure 7 to 6GoodFair20,400
Pr 923 4.4 Km over Humacao Rivergood to fair; deck 7 to 6GoodFair3,900
Pr 30 25.7 Km over Pr 60 0.3 Kmdeck 4 to 3PoorPoor60,700
Pr 60 0.70 Km over PR 198 & HUMACAO RIVsuperstructure 5 to 4PoorPoor14,600
Off Pr 910 0.6 Km over Los Pajaros Creeksuperstructure 5 to 4PoorPoor1,000
Pr 30 Eabd 25.3 Km over Pr 914 0.1 Kmsuperstructure 6 to 5; substructure up 5 to 6FairFair30,350
Pr 53 27.1 Km over Anton Ruiz Riverdeck 6 to 5FairFair15,100
Pr 53 Sobd 31.7 Km over Pr 923 Hum.river Creekdeck 7 to 6; superstructure 7 to 6; substructure 6 to 5FairFair10,200
Pr 53 Nobd 31.7 Km over Pr 923 5.5 Kmdeck 7 to 6; superstructure 7 to 6; substructure 6 to 5FairFair10,200
Fe Street 0.2 Km over Humacao Riverdeck 6 to 5FairFair950
Pr 30 over Dirt Roadsubstructure 7 to 6FairFair41,100
Pr 60 2.7 Km over Pr 924 0.9 Kmsuperstructure 7 to 6FairFair34,900
Pr 60 1.5 Km over Local Roadsuperstructure 7 to 6FairFair33,600
Pr 53 over Fronteras Creeksubstructure 8 to 7GoodGood17,800

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 53 24.8 Km over Unknown Creekfair to good; culvert up 6 to 7FairGood20,100
Pr 3 over CATAÑO Creekload posting removedFairFair14,700

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 60 0.60 Km over Pr 198 13 Kmposted for load196514,600September 2024Poor
Pr 60 0.70 Km over PR 198 & HUMACAO RIVposted for load196614,600September 2024Poor
Pr 908 over Mariana Creekposted for load19849,300February 2023Fair
Pr 924 5.2 Km over Mambiche Blanco Creekposted for load19717,600July 2024Fair
Pr 924 0.5 Km over Mabu Creekposted for load19677,500July 2024Fair
Pr 3 Km 88.6 over Candelero Riverposted for load19267,100December 2023Fair
Off Pr 910 0.6 Km over Los Pajaros Creekposted for load19601,000February 2024Poor
4th STREET over Los Muertos Creekposted for load1964650November 2024Fair
Pr 3 over CATAÑO Creekopen, posting recommended192814,700July 2023Fair

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 11 on 12 months or less, 57 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Humacao Municipio is dated December 2024; 46 bridges have an inspection dated in 2024.

Scour critical (item 113): 7 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 2 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Ramp PR60 to PR198 over Humacao Riveropen198529,200October 2024Poor
Pr 3 over CATAÑO Creekopen, posting recommended192814,700July 2023Fair
Pr 924 over Mambiche Creekopen195713,400September 2024Fair
Pr 3 Km 88.6 over Candelero Riverposted for load19267,100December 2023Fair
Pr 914 over Humacao Riveropen19521,400September 2024Fair
Off Pr 910 0.6 Km over Los Pajaros Creekposted for load19601,000February 2024Poor
Off Pr 924 over Collores Creekopen1996400September 2024Fair

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Pr 30 25.7 Km over Pr 60 0.3 Km197560,700Poor
Pr 30 27.8 Km over Pr 909 0.3 Km197641,100Poor
Pr 30 29.6 Km over DIRT ROAD & WATERWAY199541,100Poor
Pr 60 over LOCAL ROAD & MABU CR199033,600Poor
Pr 30 Wsbd 25.3 Km over Pr 914 0.1 Km196530,350Poor
Ramp PR60 to PR198 over Humacao River198529,200Poor
Pr 60 0.60 Km over Pr 198 13 Km196514,600Poor
Pr 60 0.70 Km over PR 198 & HUMACAO RIV196614,600Poor
Off Pr 910 0.6 Km over Los Pajaros Creek19601,000Poor
M Cslls St 0.05 Km over Los Muertos Creek1975650Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 30 25.7 Km over Pr 60 0.3 Km197560,700Poor
Pr 30 Km 27.2 over Pr 908 Km 0.6197641,100Fair
Pr 30 27.8 Km over Pr 909 0.3 Km197641,100Poor
Pr 30 28.6 Km over Pr 3199341,100Fair
Pr 30 over Dirt Road199541,100Fair
Pr 30 29.6 Km over DIRT ROAD & WATERWAY199541,100Poor
Pr 30 over Pr 53199741,100Good
Pr 60 North Bypass over Los Sauces Street198634,900Fair
Pr 60 2.7 Km over Pr 924 0.9 Km198634,900Fair
Pr 60 over LOCAL ROAD & MABU CR199033,600Poor

Frequently asked questions

Are any bridges closed in Humacao Municipio, Puerto Rico?

No bridges of the 68 in Humacao Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 8 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Humacao Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Humacao Municipio: no bridges with a component rated 2 (critical) or lower, 10 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.

When were bridges in Humacao Municipio last inspected?

Inspection dates in the 2025 inventory for Humacao Municipio run from February 2023 to December 2024. Intervals: 11 on 12 months or less, 57 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Humacao Municipio → - all 68, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.