Pr 114 5.6 Km over Guanajibo River
Hormigueros Municipio, Puerto Rico · rated Poor in the 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
- Pr 114 5.6 Km over Guanajibo River in Hormigueros Municipio, Puerto Rico, is rated in poor condition in the 2025 National Bridge Inventory (as of ).
- Its lowest-rated component is the substructure, rated 4 (poor condition) on the 0-9 scale.
- It was built in 1990, making it 35 years old at the 2025 inventory.
- It carries about 3,200 vehicles a day (traffic count year 2017).
- Its listed owner is the state highway agency.
- It is one of 1 of the 17 inventoried bridges in Hormigueros Municipio rated poor (5.9%); 1 (5.9%) are rated poor.
- Its traffic status in the 2025 inventory is open, posting recommended but not legally implemented (NBI item 41).
- Its class is unchanged from 2024 (poor), but component ratings moved: deck 7 to 6.
- Its most recent inspection on record is dated November 2024, on a 12-month routine inspection cycle.
- A poor rating means at least one major component - deck, superstructure, or substructure - is rated 4 or lower on FHWA's 0-9 scale. It does not by itself mean the bridge is unsafe; bridges judged unsafe are closed or load-restricted by their owners.
View this bridge on a map → (18.12896, -67.13528)
Component ratings
| Component | Rating (2024) | Rating (2025) | FHWA scale meaning |
|---|---|---|---|
| Deck | 7 | 6 | Satisfactory condition |
| Superstructure | 7 | 7 | Good condition |
| Substructure | 4 | 4 | Poor condition |
Bridge details
| Structure | Concrete multiple box beam |
| Length | about 75 ft |
| Location | 1.2 Km S of Hormigueros |
| NBI structure number | 019451 |
| Condition class | Poor |
| Traffic status (item 41) | Open, posting recommended but not legally implemented |
| Last inspection (item 90) | November 2024 |
| Inspection interval (item 91) | 12 months |
| Scour (item 113) | 4: foundations stable, field review says exposed foundations need protection |
Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.
Busiest bridges in Hormigueros Municipio
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 2 163.7 Km over Grande Creek | 1961 | 45,100 | Good |
| Pr-2 over Pr-319 | 2008 | 45,100 | Fair |
| PR-2 Km.162.0 over Unnamed Creek | 2008 | 45,100 | Good |
| Pr 2 167.1 Km over Rosario River | 1964 | 35,000 | Fair |
| Pr 100 0.01 Km over Pr 2 160.1 Km | 1974 | 20,200 | Fair |
| Pr 100 Nbd 1.0 Km over Guanajibo River | 2004 | 13,000 | Fair |
All bridges nearby: Hormigueros Municipio, PR bridge conditions · every bridge in Hormigueros Municipio · Puerto Rico bridges.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.