BridgeReportCard
Home › Puerto Rico › Hormigueros Municipio

Bridge conditions in Hormigueros Municipio, Puerto Rico

17 inventoried bridges · 0 closed · 2 posted · 1 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 17 bridges.

Hormigueros Municipio tracks close to typical: 1 of its 17 inventoried bridges (5.9%) are rated poor, against a national rate of about 7%.

What this page is: the federal bridge inspection inventory for Hormigueros Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 29.4% · Fair 64.7% · Poor 5.9% of 17 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

0
dropped into poor
since 2024
1
improved out of poor
since 2024
1
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Pr 114 5.6 Km over Guanajibo Riverdeck 7 to 6PoorPoor3,200

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 2 167.1 Km over Rosario Riverpoor to fair; substructure up 2 to 5PoorFair35,000
Pr 114 3.7 Km over Abandoned Railroadload posting removedFairFair9,800
Pr 114 4.0 Km over Guanajibo Riverload posting removedGoodGood2,200

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 2 167.1 Km over Rosario Riverposted for load196435,000February 2024Fair
Off Pr 330 2.0 Km over Duey Riverposted for load19993,600September 2023Fair
Pr 114 3.7 Km over Abandoned Railroadopen, posting recommended19399,800May 2024Fair
Pr 114 5.6 Km over Guanajibo Riveropen, posting recommended19903,200November 2024Poor

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 2 on 12 months or less, 15 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Hormigueros Municipio is dated November 2024; 7 bridges have an inspection dated in 2024.

Scour critical (item 113): 1 bridge. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 114 4.0 Km over Guanajibo Riveropen19892,200November 2023Good

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Pr 114 5.6 Km over Guanajibo River19903,200Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 2 163.7 Km over Grande Creek196145,100Good
Pr-2 over Pr-319200845,100Fair
PR-2 Km.162.0 over Unnamed Creek200845,100Good
Pr 2 167.1 Km over Rosario River196435,000Fair
Pr 100 0.01 Km over Pr 2 160.1 Km197420,200Fair
Pr 100 Nbd 1.0 Km over Guanajibo River200413,000Fair
Pr 100 SB 0.8 Km over Guanajibo River197610,100Fair
Pr 100 0.6 Km over Pr 114 3.2 Km197510,100Fair
Pr 100 over Pr 114201310,100Good
Pr 114 3.7 Km over Abandoned Railroad19399,800Fair

Frequently asked questions

Are any bridges closed in Hormigueros Municipio, Puerto Rico?

No bridges of the 17 in Hormigueros Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 2 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Hormigueros Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Hormigueros Municipio: no bridges with a component rated 2 (critical) or lower, 1 bridge rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Hormigueros Municipio last inspected?

Inspection dates in the 2025 inventory for Hormigueros Municipio run from March 2023 to November 2024. Intervals: 2 on 12 months or less, 15 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Hormigueros Municipio → - all 17, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.