BridgeReportCard
Home › Puerto Rico › Dorado Municipio › Pr 6693 1.2 Km over Creek

Pr 6693 1.2 Km over Creek

Dorado Municipio, Puerto Rico · rated Good in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.45444, -66.26188)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck77Good condition
Superstructure77Good condition
Substructure77Good condition

Bridge details

StructureConcrete tee beam
Lengthabout 52 ft
Location1 Km South Dorado
NBI structure number024381
Condition classGood
Traffic status (item 41)Open, no restriction
Last inspection (item 90)April 2024
Inspection interval (item 91)24 months
Scour (item 113)8: foundations stable, scour above the top of the footing

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Dorado Municipio

BridgeBuiltVehicles/dayCondition
Pr 22 Westbound over Pr 694199153,100Fair
Pr 22 Eastbound over Pr 694199126,550Fair
Pr 22 Westbound over Pr 659199126,550Fair
Pr 22 Eastbound over Pr 659199126,550Fair
Pr-693 over Drainage Channel198825,800Good
Pr 142 over Pr 2 25.9 Km200022,100Fair

All bridges nearby: Dorado Municipio, PR bridge conditions · every bridge in Dorado Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.