Pr 10 over Portugues River
Ponce Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
- Pr 10 over Portugues River in Ponce Municipio, Puerto Rico, is rated in fair condition in the 2025 National Bridge Inventory (as of ).
- Its lowest-rated component is the deck, rated 6 (satisfactory condition) on the 0-9 scale.
- It was built in 1999, making it 26 years old at the 2025 inventory.
- It carries about 10,410 vehicles a day (traffic count year 2006).
- Its listed owner is the state highway agency.
- It is one of 83 of the 124 inventoried bridges in Ponce Municipio rated fair (66.9%); 18 (14.5%) are rated poor.
- A fair rating means the lowest-rated major component scores 5 or 6 on FHWA's 0-9 scale: some deterioration or minor section loss, but the structure is sound. It is the middle class, not a warning.
View this bridge on a map → (18.08868, -66.64031)
Component ratings
| Component | Rating (2025) | FHWA scale meaning |
|---|---|---|
| Deck | 6 | Satisfactory condition |
| Superstructure | 7 | Good condition |
| Substructure | 6 | Satisfactory condition |
Bridge details
| Structure | Prestressed concrete stringer or multi-beam girder |
| Length | about 410 ft |
| Location | 0.1 Km Int. Pr-503 |
| NBI structure number | 025591 |
| Condition class | Fair |
Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.
Busiest bridges in Ponce Municipio
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Off Pr 14 5.5 Km over Inabon River | 1978 | 63,700 | Fair |
| Pr 52 over Bucana River | 1995 | 51,907 | Fair |
| Pr 52 over Dirt Road | 1995 | 50,800 | Poor |
| Pr 52 102.3 Km over Dirt Road | 1995 | 50,800 | Poor |
| Pr 52 Southbound over Local Road | 1995 | 50,800 | Fair |
| Pr 2 221.6 Km over CONNECTOR PR 591 & H | 2010 | 49,800 | Fair |
All bridges nearby: Ponce Municipio, PR bridge conditions · every bridge in Ponce Municipio · Puerto Rico bridges.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.