Off Pr 372 2.5 Km over Duey River
Yauco Municipio, Puerto Rico · rated Poor in the 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
- Off Pr 372 2.5 Km over Duey River in Yauco Municipio, Puerto Rico, is rated in poor condition in the 2025 National Bridge Inventory (as of ).
- Its lowest-rated component is the deck, rated 3 (serious condition) on the 0-9 scale.
- It was built in 1993, making it 32 years old at the 2025 inventory.
- It carries about 2,200 vehicles a day (traffic count year 2017).
- Its listed owner is a city or municipal highway agency.
- It is one of 7 of the 41 inventoried bridges in Yauco Municipio rated poor (17.1%); 7 (17.1%) are rated poor.
- Its traffic status in the 2025 inventory is posted for load (NBI item 41).
- Its condition class and component ratings are unchanged from the 2024 inventory.
- Its most recent inspection on record is dated March 2025, on a 6-month routine inspection cycle.
- It is coded scour critical (NBI item 113 = 3): scour critical: foundations unstable for the assessed or calculated scour.
- A poor rating means at least one major component - deck, superstructure, or substructure - is rated 4 or lower on FHWA's 0-9 scale. It does not by itself mean the bridge is unsafe; bridges judged unsafe are closed or load-restricted by their owners.
View this bridge on a map → (18.06583, -66.8425)
Component ratings
| Component | Rating (2024) | Rating (2025) | FHWA scale meaning |
|---|---|---|---|
| Deck | 3 | 3 | Serious condition |
| Superstructure | 5 | 5 | Fair condition |
| Substructure | 5 | 5 | Fair condition |
Bridge details
| Structure | Concrete stringer or multi-beam girder |
| Length | about 49 ft |
| Location | 3KM.NORTH of Yauco |
| NBI structure number | 025721 |
| Condition class | Poor |
| Traffic status (item 41) | Posted for load |
| Last inspection (item 90) | March 2025 |
| Inspection interval (item 91) | 6 months |
| Scour (item 113) | 3: scour critical: foundations unstable for the assessed or calculated scour |
Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.
Busiest bridges in Yauco Municipio
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 2 198.6 Km over Dirt Road | 1972 | 37,000 | Fair |
| Pr 2 over Berrenchin Creek | 1998 | 37,000 | Good |
| Pr-2 over YAUCO RIVER & PR-335 | 2003 | 37,000 | Poor |
| Pr 2 197.85 Km over Pr 128 | 1972 | 19,900 | Fair |
| Pr 2 Webd 200.9 Km over Dirt Road | 2014 | 19,550 | Fair |
| Pr 2 Eabd 200.9 Km over Dirt Road | 2014 | 19,550 | Fair |
All bridges nearby: Yauco Municipio, PR bridge conditions · every bridge in Yauco Municipio · Puerto Rico bridges.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.