Bridge conditions in Yauco Municipio, Puerto Rico
41 inventoried bridges · 0 closed · 10 posted · 7 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 41 bridges.
Of the 41 Yauco Municipio bridges in the federal inventory, 7 carry a poor rating. That 17.1% share is roughly 3x the national average.
- 7 of the 41 bridges in Yauco Municipio, Puerto Rico, are rated in poor condition (17.1%) in the 2025 National Bridge Inventory, as of .
- Yauco Municipio has no bridges closed to all traffic and 10 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 3 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 1 bridge dropped into poor condition and no bridges improved out of it; 5 bridges had at least one major component rating lowered, 1 newly load-posted.
- 1 bridge has a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from February 2023 to March 2025; 9 bridges over water are coded scour critical.
- 5 bridges (12.2%) are rated good and 29 (70.7%) fair.
- The median Yauco Municipio bridge was built in 1988.
- The busiest poor-rated bridge is Pr-2 over YAUCO RIVER & PR-335 (built 2003), carrying about 37,000 vehicles a day.
What this page is: the federal bridge inspection inventory for Yauco Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 12.2% · Fair 70.7% · Poor 17.1% of 41 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr-2 over YAUCO RIVER & PR-335 | fair to poor; deck 5 to 4 | Fair | Poor | 37,000 |
| Off Pr 368 12.3 Km over Unknown Creek | newly posted for load; superstructure up 5 to 6 | Poor | Poor | 18,400 |
| Off Pr 372 over Rio Duey | good to fair; deck 8 to 6 | Good | Fair | 600 |
| Pr 2 Webd 200.9 Km over Dirt Road | good to fair; superstructure 8 to 7; substructure 7 to 6 | Good | Fair | 19,550 |
| Pr 2 Eabd 200.9 Km over Dirt Road | good to fair; substructure 7 to 6 | Good | Fair | 19,550 |
| Cljn Castro over Rio Duey | deck 7 to 4; substructure up 4 to 5 | Poor | Poor | 200 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 128 10.1 Km over Luchetti Lake Dam | load posting removed | Fair | Fair | 2,900 |
| Pr 368 10.25 Km over Loco River | load posting removed | Good | Good | 1,000 |
| Pr 372 16.5 Km over Duey River | load posting removed | Fair | Fair | 600 |
1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Off Pr 368 12.3 Km over Unknown Creek | posted for load | 1988 | 18,400 | May 2024 | Poor |
| Pr 368 12.20 Km over Susua Creek | posted for load | 1960 | 18,400 | July 2024 | Fair |
| Off Pr 371 2.1 Km over Unknown Waterway | posted for load | 1980 | 5,800 | December 2023 | Fair |
| Pr 368 13.5 Km over Berrenchin Creek | posted for load | 1953 | 4,500 | August 2024 | Fair |
| Pr 128 11.5 Km over Grande Creek | posted for load | 1953 | 2,900 | November 2023 | Fair |
| Off Pr 372 0.2 Km over Duey River | posted for load | 1988 | 2,200 | February 2024 | Poor |
| Off Pr 372 2.5 Km over Duey River | posted for load | 1993 | 2,200 | March 2025 | Poor |
| Off Pr 372 over Rio Duey | posted for load | 1901 | 600 | October 2023 | Fair |
| Cljn Castro over Rio Duey | posted for load | 1901 | 200 | November 2024 | Poor |
| OFF PR 371 km 0.4 over Unknown Waterway | posted for load | 1980 | 100 | March 2023 | Fair |
| Pr 128 10.1 Km over Luchetti Lake Dam | open, posting recommended | 1959 | 2,900 | August 2024 | Fair |
| Pr 372 16.5 Km over Duey River | open, posting recommended | 2012 | 600 | August 2024 | Fair |
| Off Pr 372 Km 0.5 over Duey River | open on a temporary structure | 1978 | 100 | February 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 9 on 12 months or less, 32 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Yauco Municipio is dated March 2025; 1 bridges have an inspection dated in 2025.
Scour critical (item 113): 9 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 3 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Off Pr 371 2.1 Km over Unknown Waterway | posted for load | 1980 | 5,800 | December 2023 | Fair |
| Off Pr 372 0.2 Km over Duey River | posted for load | 1988 | 2,200 | February 2024 | Poor |
| Off Pr 372 2.5 Km over Duey River | posted for load | 1993 | 2,200 | March 2025 | Poor |
| Pr 375 9.35 Km over Grande Creek | open | 2003 | 1,000 | August 2024 | Fair |
| Pr 372 16.5 Km over Duey River | open, posting recommended | 2012 | 600 | August 2024 | Fair |
| Pr 375 over Waterway | open | 2007 | 300 | November 2024 | Fair |
| Off Pr 372 Km 0.5 over Duey River | open on a temporary structure | 1978 | 100 | February 2024 | Poor |
| Off Pr 372 over Duey River | open | 1978 | 100 | February 2024 | Fair |
| Pr 375 9.40 Km over Grande Creek | open | 2003 | 100 | August 2024 | Fair |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Off Pr 372 Km 0.5 over Duey River | open on a temporary structure | 1978 | 100 | February 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr-2 over YAUCO RIVER & PR-335 | 2003 | 37,000 | Poor |
| Off Pr 368 12.3 Km over Unknown Creek | 1988 | 18,400 | Poor |
| Off Pr 335 3.9 Km over Yauco River | 1986 | 9,300 | Poor |
| Off Pr 372 2.5 Km over Duey River | 1993 | 2,200 | Poor |
| Off Pr 372 0.2 Km over Duey River | 1988 | 2,200 | Poor |
| Cljn Castro over Rio Duey | 1901 | 200 | Poor |
| Off Pr 372 Km 0.5 over Duey River | 1978 | 100 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 2 198.6 Km over Dirt Road | 1972 | 37,000 | Fair |
| Pr 2 over Berrenchin Creek | 1998 | 37,000 | Good |
| Pr-2 over YAUCO RIVER & PR-335 | 2003 | 37,000 | Poor |
| Pr 2 197.85 Km over Pr 128 | 1972 | 19,900 | Fair |
| Pr 2 Webd 200.9 Km over Dirt Road | 2014 | 19,550 | Fair |
| Pr 2 Eabd 200.9 Km over Dirt Road | 2014 | 19,550 | Fair |
| Pr 368 12.20 Km over Susua Creek | 1960 | 18,400 | Fair |
| Off Pr 368 12.3 Km over Unknown Creek | 1988 | 18,400 | Poor |
| Off Pr 368 12 Km over Unknown Creek | 2000 | 18,400 | Good |
| Pr 326 3.5 Km over Loco River | 2000 | 13,500 | Fair |
Frequently asked questions
Are any bridges closed in Yauco Municipio, Puerto Rico?
No bridges of the 41 in Yauco Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 10 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Yauco Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Yauco Municipio: 1 bridge with a component rated 2 (critical) or lower, 7 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.
When were bridges in Yauco Municipio last inspected?
Inspection dates in the 2025 inventory for Yauco Municipio run from February 2023 to March 2025. Intervals: 9 on 12 months or less, 32 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Yauco Municipio → - all 41, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.