BridgeReportCard
Home › Puerto Rico › Yabucoa Municipio › Off Pr 182 12.2 Km over Guayanes River

Off Pr 182 12.2 Km over Guayanes River

Yabucoa Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.07987, -65.95998)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck55Fair condition
Superstructure77Good condition
Substructure55Fair condition

Bridge details

StructureConcrete stringer or multi-beam girder
Lengthabout 60 ft
Location12.5 Km NW. Yabucoa
NBI structure number025791
Condition classFair
Traffic status (item 41)Open, posting recommended but not legally implemented
Last inspection (item 90)July 2024
Inspection interval (item 91)12 months
Scour (item 113)3: scour critical: foundations unstable for the assessed or calculated scour

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Yabucoa Municipio

BridgeBuiltVehicles/dayCondition
Pr 53 43.4 Km over Sun Oil Utilities199818,000Fair
Pr 53 39.6 Km over Los Pinos Road199517,900Fair
Pr 53 40.0 Km over Pr 906 1.8 Km199717,900Fair
Pr 53 40.2 Km over Guayanes River199717,900Good
Pr 182 1.7 Km over Aguas Largas Creek194615,500Fair
Pr 182 4.6 Km over Rosa Sanchez Channel199714,600Good

All bridges nearby: Yabucoa Municipio, PR bridge conditions · every bridge in Yabucoa Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.