42 inventoried bridges · 0 closed · 10 posted · 9 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 42 bridges.

About one in 5 bridges in Yabucoa Municipio is rated in poor condition: 9 of 42 on the federal inventory, one of the higher shares in Puerto Rico.

What this page is: the federal bridge inspection inventory for Yabucoa Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 21.4% · Fair 57.1% · Poor 21.4% of 42 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

1
dropped into poor
since 2024
1
improved out of poor
since 2024
7
had a rating lowered
deck, superstructure, substructure or culvert
1
newly closed or posted
0 closed, 1 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Pr 920 8.1 Km over Limones Riverload posting removed; fair to poor; substructure 7 to 4FairPoor2,000
Pr 181 13.6 Km over Guayabota Creeknewly posted for load; superstructure 6 to 5FairFair6,300
Pr 53 43.4 Km over Sun Oil Utilitiesgood to fair; deck 7 to 6GoodFair18,000
Pr 9905 0.3 Km over San Ingenio Rivergood to fair; culvert 7 to 6GoodFair500
Pr 3 92.8 Km over Pollalito Creeksuperstructure 6 to 5FairFair8,800
Off Pr 182 14.2 Km over Guayanes Riversubstructure 6 to 5; deck up 8 to 9FairFair1,500
Pr 53 40.0 Km over Pr 906 1.8 Kmdeck 7 to 6; superstructure 8 to 7FairFair17,900

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 181 12.6 Km over Prieto Riverload posting removedFairFair6,600
Pr 181 12.0 Km over Campo Azul Creekload posting removed; deck up 6 to 7; superstructure up 6 to 7FairFair6,300
Pr 901 4.1 Km over Laja Creekload posting removedFairFair4,500
Pr 920 7.8 Km over Waterwayreopened; poor to good; deck up 0 to 7; superstructure up 0 to 7; substructure up 0 to 8PoorGood2,000
Pr 181 14.9 Km over Prieto Riverload posting removedPoorPoor1,800
Off Pr 182 12.2 Km over Guayanes Riverload posting removedFairFair1,500
Pr 900 4.8 Km over Guayabo Creekload posting removedPoorPoor1,400
Pr 904 0.50 Km over Limones Riverload posting removedFairFair600

1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 182 1.7 Km over Aguas Largas Creekposted for load194615,500November 2023Fair
Pr 3 95.7 Km over Guayanes Riverposted for load191811,100July 2024Fair
Pr 9901 over Camino Nuevo Creekposted for load20137,135March 2023Good
Pr 181 13.6 Km over Guayabota Creekposted for load19406,300November 2023Fair
Off Pr 182 11.2 Km over Guayanes Riverposted for load19882,000March 2024Poor
Pr 181 14.7 Km over Sanchez Creekposted for load19401,800October 2024Poor
Pr 902 11.5 Km over Limones Riverposted for load1962900January 2024Fair
6TH Street Km 10.1 over Creekposted for load1960750February 2024Poor
Off Pr 900 at K0.7 over La Yuca Creekposted for load2012200March 2023Fair
Offpr 900 Km .65 over La Yuca Creekposted for load2012200February 2023Fair
Pr 181 12.6 Km over Prieto Riveropen, posting recommended19406,600July 2024Fair
Pr 181 12.0 Km over Campo Azul Creekopen, posting recommended19406,300December 2023Fair
Pr 901 4.1 Km over Laja Creekopen, posting recommended19554,500July 2024Fair
Pr 920 7.8 Km over Waterwayopen on a temporary structure19732,000December 2023Good
Pr 181 14.9 Km over Prieto Riveropen, posting recommended19401,800October 2024Poor
Off Pr 182 12.2 Km over Guayanes Riveropen, posting recommended19971,500July 2024Fair
Pr 900 4.8 Km over Guayabo Creekopen, posting recommended19551,400March 2024Poor
Pr 904 0.50 Km over Limones Riveropen, posting recommended1953600November 2023Fair

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 12 on 12 months or less, 30 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Yabucoa Municipio is dated March 2025; 1 bridges have an inspection dated in 2025.

Scour critical (item 113): 15 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 2 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 3 over Cortadora Creekopen191811,300September 2023Fair
Pr 3 91.95 Km over Aguacate Creekopen19208,800March 2024Poor
Pr 3 91.4 Km over Ingenio Riveropen19188,600December 2024Fair
Pr 182 0.9 Km over Santiago Channelopen19467,100March 2025Poor
Pr 9910 0.9 Km over Santiago Channelopen19196,600July 2024Fair
Pr 181 13.6 Km over Guayabota Creekposted for load19406,300November 2023Fair
Pr 901 6.3 Km over Juan Martin Creekopen19634,500August 2024Poor
Off Pr 182 11.2 Km over Guayanes Riverposted for load19882,000March 2024Poor
Pr 920 7.8 Km over Waterwayopen on a temporary structure19732,000December 2023Good
Pr 920 7.8 Km over Waterwayopen19732,000January 2024Good
Pr 920 8.1 Km over Limones Riveropen19722,000February 2024Poor
Pr 181 14.9 Km over Prieto Riveropen, posting recommended19401,800October 2024Poor
Off Pr 182 12.2 Km over Guayanes Riveropen, posting recommended19971,500July 2024Fair
Pr 900 4.8 Km over Guayabo Creekopen, posting recommended19551,400March 2024Poor
Pr 902 11.5 Km over Limones Riverposted for load1962900January 2024Fair

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Pr 3 91.95 Km over Aguacate Creek19208,800Poor
Pr 182 0.9 Km over Santiago Channel19467,100Poor
Pr 901 6.3 Km over Juan Martin Creek19634,500Poor
Pr 920 8.1 Km over Limones River19722,000Poor
Off Pr 182 11.2 Km over Guayanes River19882,000Poor
Pr 181 14.7 Km over Sanchez Creek19401,800Poor
Pr 181 14.9 Km over Prieto River19401,800Poor
Pr 900 4.8 Km over Guayabo Creek19551,400Poor
6TH Street Km 10.1 over Creek1960750Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 53 43.4 Km over Sun Oil Utilities199818,000Fair
Pr 53 39.6 Km over Los Pinos Road199517,900Fair
Pr 53 40.0 Km over Pr 906 1.8 Km199717,900Fair
Pr 53 40.2 Km over Guayanes River199717,900Good
Pr 182 1.7 Km over Aguas Largas Creek194615,500Fair
Pr 182 4.6 Km over Rosa Sanchez Channel199714,600Good
Off Pr 182 3.5 Km over Rosa Sanchez Channel199214,600Good
Pr 182 3.8 Km over Guayanes River200314,600Good
Pr 3 over Cortadora Creek191811,300Fair
Pr 3 95.7 Km over Guayanes River191811,100Fair

Frequently asked questions

Are any bridges closed in Yabucoa Municipio, Puerto Rico?

No bridges of the 42 in Yabucoa Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 10 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Yabucoa Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Yabucoa Municipio: no bridges with a component rated 2 (critical) or lower, 9 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.

When were bridges in Yabucoa Municipio last inspected?

Inspection dates in the 2025 inventory for Yabucoa Municipio run from February 2023 to March 2025. Intervals: 12 on 12 months or less, 30 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Yabucoa Municipio → - all 42, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.