BridgeReportCard
Home › Puerto Rico › Peñuelas Municipio › Pr-3132 over Tallaboa River

Pr-3132 over Tallaboa River

Peñuelas Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.04948, -66.72086)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck55Fair condition
Superstructure88Very good condition
Substructure77Good condition

Bridge details

StructurePrestressed concrete stringer or multi-beam girder
Lengthabout 679 ft
Location1 Km. S.E. of PEÑUEL
NBI structure number027891
Condition classFair
Traffic status (item 41)Open, no restriction
Last inspection (item 90)August 2024
Inspection interval (item 91)24 months
Scour (item 113)8: foundations stable, scour above the top of the footing

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Peñuelas Municipio

BridgeBuiltVehicles/dayCondition
Pr 2 Westbound over Pr 385196834,400Fair
Pr 2 Eastbound over Pr 385196834,400Fair
Pr 2 212.4 Km over Tallaboa River196833,800Poor
Pr 2 Wesb 214.5 Km over Connector Pr 2 to Pr 127199121,100Fair
Pr 2 Easb 214.5 Km over Pr 127 0.1 Km199121,100Fair
Pr 2 Esbd 211.9 Km over Pr 384 0.1 Km196818,550Fair

All bridges nearby: Peñuelas Municipio, PR bridge conditions · every bridge in Peñuelas Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.