BridgeReportCard
Home › Puerto Rico › Peñuelas Municipio

Bridge conditions in Peñuelas Municipio, Puerto Rico

25 inventoried bridges · 0 closed · 6 posted · 5 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 25 bridges.

About one in 5 bridges in Peñuelas Municipio is rated in poor condition: 5 of 25 on the federal inventory, one of the higher shares in Puerto Rico.

What this page is: the federal bridge inspection inventory for Peñuelas Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 4.0% · Fair 76.0% · Poor 20.0% of 25 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

2
dropped into poor
since 2024
0
improved out of poor
since 2024
6
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Pr 2 212.4 Km over Tallaboa Riverfair to poor; substructure 6 to 3FairPoor33,800
Pr 384 3.1 Km over Tallaboa Riverfair to poor; deck 6 to 5; substructure 6 to 3FairPoor1,000
Calle 7 0.4 Km over Quebrada Ceibagood to fair; deck 8 to 6; superstructure up 7 to 8GoodFair900
Off Pr 132 0.1 Km over Tallaboa Rivergood to fair; deck 7 to 6GoodFair8,400
Pr 132 12 Km over Qebrada Santo Domingogood to fair; deck 7 to 6; superstructure 8 to 7GoodFair3,800
Pr 2 Easb 214.5 Km over Pr 127 0.1 Kmsubstructure 7 to 6FairFair21,100

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 127 17.4 Km over Discharge From Plantload posting removedFairFair4,000

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 391 6.1 Km over Los Jobos Riverposted for load19557,200August 2024Fair
Pr 127 over Tallaboa Riverposted for load19354,000March 2025Poor
Pr 384 3.1 Km over Tallaboa Riverposted for load19721,000March 2025Poor
Calle 7 0.4 Km over Quebrada Ceibaposted for load2019900October 2023Fair
Pr 383 0.9 Km over Cedro Creekposted for load1964400July 2024Fair
Off Pr 391 2.6 Km over Tallaboa Riverposted for load1965125August 2024Poor
Pr 127 17.4 Km over Discharge From Plantopen, posting recommended19354,000February 2024Fair

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 5 on 12 months or less, 20 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Peñuelas Municipio is dated March 2025; 2 bridges have an inspection dated in 2025.

Scour critical (item 113): 8 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 2 212.4 Km over Tallaboa Riveropen196833,800August 2024Poor
Pr 391 6.1 Km over Los Jobos Riverposted for load19557,200August 2024Fair
Pr 127 over Tallaboa Riverposted for load19354,000March 2025Poor
Pr 386 0.3 Km over Guayanes Riveropen19693,800February 2024Fair
Pr 384 3.1 Km over Tallaboa Riverposted for load19721,000March 2025Poor
City St 0.30 Km over Guayanes Riveropen1976900December 2023Fair
Off Pr 132 10.9 Km over Guayanes Riveropen1976900December 2024Poor
Off 383 0.5 Km over Cedro Creekopen1994400December 2023Fair

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Pr 2 212.4 Km over Tallaboa River196833,800Poor
Pr 127 over Tallaboa River19354,000Poor
Pr 384 3.1 Km over Tallaboa River19721,000Poor
Off Pr 132 10.9 Km over Guayanes River1976900Poor
Off Pr 391 2.6 Km over Tallaboa River1965125Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 2 Westbound over Pr 385196834,400Fair
Pr 2 Eastbound over Pr 385196834,400Fair
Pr 2 212.4 Km over Tallaboa River196833,800Poor
Pr 2 Wesb 214.5 Km over Connector Pr 2 to Pr 127199121,100Fair
Pr 2 Easb 214.5 Km over Pr 127 0.1 Km199121,100Fair
Pr 2 Esbd 211.9 Km over Pr 384 0.1 Km196818,550Fair
Pr 2 Wbnd 211.9 Km over Pr 384 0.1 Km196818,550Fair
Off Pr 132 14.3 Km over Celba Creek200516,500Good
Pr-3132 over Tallaboa River20068,700Fair
Pr 132 5.1 Km over Macana River19128,400Fair

Frequently asked questions

Are any bridges closed in Peñuelas Municipio, Puerto Rico?

No bridges of the 25 in Peñuelas Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 6 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Peñuelas Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Peñuelas Municipio: no bridges with a component rated 2 (critical) or lower, 5 bridges rated poor overall, and 2 bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Peñuelas Municipio last inspected?

Inspection dates in the 2025 inventory for Peñuelas Municipio run from March 2023 to March 2025. Intervals: 5 on 12 months or less, 20 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Peñuelas Municipio → - all 25, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.