BridgeReportCard
Home › Puerto Rico › Arroyo Municipio › Off Pr 755 over Irrigation Channel

Off Pr 755 over Irrigation Channel

Arroyo Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (17.9925, -66.04892)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck88Very good condition
Superstructure77Good condition
Substructure66Satisfactory condition

Bridge details

StructurePrestressed concrete multiple box beam
Lengthabout 34 ft
Location@ 3.65 Km NE Arroyo
NBI structure number027981
Condition classFair
Traffic status (item 41)Posted for load
Last inspection (item 90)November 2024
Inspection interval (item 91)24 months
Scour (item 113)8: foundations stable, scour above the top of the footing

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Arroyo Municipio

BridgeBuiltVehicles/dayCondition
Pr 3 132.5 Km over Nigua River198127,700Fair
Pr 3 over Yaurel Creek200319,800Good
Pr 3 Km 132.0 over Nigua River200517,600Fair
Pr 54 over Patillas Channel200017,500Good
Pr 753 over Irrigation Channel194810,300Fair
Pr 178 0.8 Km over Nigua River19887,500Fair

All bridges nearby: Arroyo Municipio, PR bridge conditions · every bridge in Arroyo Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.