BridgeReportCard
Home › Puerto Rico › Patillas Municipio › Pr 184 8.8 Km over Unnamed Creek

Pr 184 8.8 Km over Unnamed Creek

Patillas Municipio, Puerto Rico · rated Good in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.05209, -66.05028)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck88Very good condition
Superstructure88Very good condition
Substructure88Very good condition

Bridge details

StructurePrestressed concrete stringer or multi-beam girder
Lengthabout 55 ft
Location8.5 Km NW of Patillas
NBI structure number028091
Condition classGood
Traffic status (item 41)Open, no restriction
Last inspection (item 90)October 2024
Inspection interval (item 91)24 months
Scour (item 113)8: foundations stable, scour above the top of the footing

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Patillas Municipio

BridgeBuiltVehicles/dayCondition
Pr 3R 0.5 Km over Irrigation Channel198648,600Fair
Pr 3 over Grande De Patillas River200313,900Good
Pr-3 over Irrigation Channel200913,900Good
Pr 181 34.1 Km over Irrigation Channel200911,900Good
Pr 3 117.9 Km over Jacaboa River19419,100Poor
Pr 3 123.8 Km over Chico River19518,300Fair

All bridges nearby: Patillas Municipio, PR bridge conditions · every bridge in Patillas Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.