BridgeReportCard
Home › Puerto Rico › Yabucoa Municipio › Offpr 900 Km .65 over La Yuca Creek

Offpr 900 Km .65 over La Yuca Creek

Yabucoa Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.04583, -65.88639)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck77Good condition
Superstructure66Satisfactory condition
Substructure77Good condition

Bridge details

StructureSteel girder and floorbeam
Lengthabout 36 ft
Location0.90KM SW Yabucoa
NBI structure number029821
Condition classFair
Traffic status (item 41)Posted for load
Last inspection (item 90)February 2023
Inspection interval (item 91)24 months
Scour (item 113)8: foundations stable, scour above the top of the footing

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Yabucoa Municipio

BridgeBuiltVehicles/dayCondition
Pr 53 43.4 Km over Sun Oil Utilities199818,000Fair
Pr 53 39.6 Km over Los Pinos Road199517,900Fair
Pr 53 40.0 Km over Pr 906 1.8 Km199717,900Fair
Pr 53 40.2 Km over Guayanes River199717,900Good
Pr 182 1.7 Km over Aguas Largas Creek194615,500Fair
Pr 182 4.6 Km over Rosa Sanchez Channel199714,600Good

All bridges nearby: Yabucoa Municipio, PR bridge conditions · every bridge in Yabucoa Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.