BridgeReportCard
Home › Puerto Rico › Trujillo Alto Municipio › Cam Los NUÑEZ over Stream

Cam Los NUÑEZ over Stream

Trujillo Alto Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.32182, -65.97477)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck66Satisfactory condition
Superstructure77Good condition
Substructure77Good condition

Bridge details

StructurePrestressed concrete multiple box beam
Lengthabout 85 ft
Location250M From Pr 852 Km 3.2
NBI structure number030711
Condition classFair
Traffic status (item 41)Open, no restriction
Last inspection (item 90)August 2023
Inspection interval (item 91)24 months
Scour (item 113)8: foundations stable, scour above the top of the footing

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Trujillo Alto Municipio

BridgeBuiltVehicles/dayCondition
Pr 181 62.0 Km over Grande De Loiza River198542,600Poor
Pr 8860 over Creek199325,900Good
Pr 181 over Infierno Creek192513,400Fair
Pr 852 0.05 Km over Dos Bocas Creek198010,400Fair
Pr 175 12 Km over Creek19506,800Poor
Pr 175 over Carraizo Creek19536,600Fair

All bridges nearby: Trujillo Alto Municipio, PR bridge conditions · every bridge in Trujillo Alto Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.