BridgeReportCard
Home › Puerto Rico › Peñuelas Municipio › Calle 7 0.4 Km over Quebrada Ceiba

Calle 7 0.4 Km over Quebrada Ceiba

Peñuelas Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.05405, -66.71066)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck86Satisfactory condition
Superstructure78Very good condition
Substructure77Good condition

Bridge details

StructureConcrete tee beam
Lengthabout 55 ft
Location_
NBI structure number030911
Condition classFair
Traffic status (item 41)Posted for load
Last inspection (item 90)October 2023
Inspection interval (item 91)24 months
Scour (item 113)5: foundations stable, scour within the limits of the footing or piles

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Peñuelas Municipio

BridgeBuiltVehicles/dayCondition
Pr 2 Westbound over Pr 385196834,400Fair
Pr 2 Eastbound over Pr 385196834,400Fair
Pr 2 212.4 Km over Tallaboa River196833,800Poor
Pr 2 Wesb 214.5 Km over Connector Pr 2 to Pr 127199121,100Fair
Pr 2 Easb 214.5 Km over Pr 127 0.1 Km199121,100Fair
Pr 2 Esbd 211.9 Km over Pr 384 0.1 Km196818,550Fair

All bridges nearby: Peñuelas Municipio, PR bridge conditions · every bridge in Peñuelas Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.