Off Pr 372 over Duey River
Yauco Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
- Off Pr 372 over Duey River in Yauco Municipio, Puerto Rico, is rated in fair condition in the 2025 National Bridge Inventory (as of ).
- Its lowest-rated component is the culvert, rated 5 (fair condition) on the 0-9 scale.
- It was built in 1978, making it 47 years old at the 2025 inventory.
- It carries about 100 vehicles a day (traffic count year 2017).
- Its listed owner is a city or municipal highway agency.
- It is one of 29 of the 41 inventoried bridges in Yauco Municipio rated fair (70.7%); 7 (17.1%) are rated poor.
- A fair rating means the lowest-rated major component scores 5 or 6 on FHWA's 0-9 scale: some deterioration or minor section loss, but the structure is sound. It is the middle class, not a warning.
View this bridge on a map → (18.21628, -66.58521)
Component ratings
| Component | Rating (2025) | FHWA scale meaning |
|---|---|---|
| Culvert | 5 | Fair condition |
Bridge details
| Structure | Concrete culvert |
| Length | about 38 ft |
| Location | 0.2 Km East of Pr 372 |
| NBI structure number | E11251 |
| Condition class | Fair |
Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.
Busiest bridges in Yauco Municipio
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 2 198.6 Km over Dirt Road | 1972 | 37,000 | Fair |
| Pr 2 over Berrenchin Creek | 1998 | 37,000 | Good |
| Pr-2 over YAUCO RIVER & PR-335 | 2003 | 37,000 | Poor |
| Pr 2 197.85 Km over Pr 128 | 1972 | 19,900 | Fair |
| Pr 2 Webd 200.9 Km over Dirt Road | 2014 | 19,550 | Fair |
| Pr 2 Eabd 200.9 Km over Dirt Road | 2014 | 19,550 | Fair |
All bridges nearby: Yauco Municipio, PR bridge conditions · every bridge in Yauco Municipio · Puerto Rico bridges.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.