Off Pr 110 10.5 Km over Creek
Moca Municipio, Puerto Rico · rated Good in the 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
- Off Pr 110 10.5 Km over Creek in Moca Municipio, Puerto Rico, is rated in good condition in the 2025 National Bridge Inventory (as of ).
- Its lowest-rated component is the deck, rated 8 (very good condition) on the 0-9 scale.
- It was built in 1965, making it 60 years old at the 2025 inventory.
- It carries about 3,600 vehicles a day (traffic count year 2017).
- Its listed owner is a city or municipal highway agency.
- It is one of 5 of the 15 inventoried bridges in Moca Municipio rated good (33.3%); 3 (20.0%) are rated poor.
- Its traffic status in the 2025 inventory is open, no restriction (NBI item 41).
- It does not appear under this structure number in the 2024 inventory (a new or renumbered structure).
- Its most recent inspection on record is dated May 2024, on a 24-month routine inspection cycle.
- It is coded scour critical (NBI item 113 = 3): scour critical: foundations unstable for the assessed or calculated scour.
- It has fracture-critical members (NBI item 92A): steel tension members without a redundant load path, which get their own scheduled inspections.
- A good rating means every major component - deck, superstructure, substructure, or culvert - is rated 7 or higher on FHWA's 0-9 scale: no more than minor problems.
View this bridge on a map → (18.37448, -67.11416)
Component ratings
| Component | Rating (2025) | FHWA scale meaning |
|---|---|---|
| Deck | 8 | Very good condition |
| Superstructure | 8 | Very good condition |
| Substructure | 8 | Very good condition |
Bridge details
| Length | about 31 ft |
| Location | 1.5 Km Southeast of Moca |
| NBI structure number | E14921 |
| Condition class | Good |
| Traffic status (item 41) | Open, no restriction |
| Last inspection (item 90) | May 2024 |
| Inspection interval (item 91) | 24 months |
| Scour (item 113) | 3: scour critical: foundations unstable for the assessed or calculated scour |
| Fracture critical (item 92A) | Yes |
Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.
Busiest bridges in Moca Municipio
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr-111 over Stream | 1901 | 17,300 | Good |
| Pr 110 10.05 Km over Culebrinas River | 1955 | 9,000 | Poor |
| Pr 125 4.6 Km over Grande Creek | 1921 | 4,800 | Fair |
| Pr 110R 1.2 Km over Pr 111 4.4 Km | 1970 | 3,600 | Poor |
| Off Pr 110 10.7 Km over Creek | 1965 | 3,600 | Good |
| City St 2.05 Km over Waterway | 2009 | 3,600 | Fair |
All bridges nearby: Moca Municipio, PR bridge conditions · every bridge in Moca Municipio · Puerto Rico bridges.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.