Bridge conditions in Moca Municipio, Puerto Rico
15 inventoried bridges · 0 closed · 2 posted · 3 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 15 bridges.
About one in 5 bridges in Moca Municipio is rated in poor condition: 3 of 15 on the federal inventory, one of the higher shares in Puerto Rico.
- 3 of the 15 bridges in Moca Municipio, Puerto Rico, are rated in poor condition (20.0%) in the 2025 National Bridge Inventory, as of .
- Moca Municipio has no bridges closed to all traffic and 2 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 3 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 1 bridge dropped into poor condition and 1 bridge improved out of it; 4 bridges had at least one major component rating lowered.
- 1 bridge has a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from May 2023 to November 2024; 7 bridges over water are coded scour critical.
- 5 bridges (33.3%) are rated good and 7 (46.7%) fair.
- The median Moca Municipio bridge was built in 1966.
- The busiest poor-rated bridge is Pr 110 10.05 Km over Culebrinas River (built 1955), carrying about 9,000 vehicles a day.
What this page is: the federal bridge inspection inventory for Moca Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 33.3% · Fair 46.7% · Poor 20.0% of 15 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 110 10.05 Km over Culebrinas River | fair to poor; superstructure 5 to 4 | Fair | Poor | 9,000 |
| Pr 125 4.6 Km over Grande Creek | superstructure 6 to 5 | Fair | Fair | 4,800 |
| Off Pr 404 4.3 Km over Los Morones Creek | substructure 6 to 5 | Fair | Fair | 600 |
| Pr-111 over Stream | deck 8 to 7; superstructure 8 to 7 | Good | Good | 17,300 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Off Pr 110 10.7 Km over Creek | reopened; poor to good; deck up 4 to 8; superstructure up 5 to 8; substructure up 2 to 8 | Poor | Good | 3,600 |
2 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 125 4.6 Km over Grande Creek | posted for load | 1921 | 4,800 | April 2024 | Fair |
| Off Pr 404 4.3 Km over Los Morones Creek | posted for load | 2012 | 600 | August 2024 | Fair |
| Pr-111 over Stream | open on a temporary structure | 1901 | 17,300 | October 2023 | Good |
| Off Pr 110 10.7 Km over Creek | open on a temporary structure | 1965 | 3,600 | May 2024 | Good |
| Pr 404 over Culebrinas River | open on a temporary structure | 1953 | 600 | May 2023 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 4 on 12 months or less, 11 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Moca Municipio is dated November 2024; 8 bridges have an inspection dated in 2024.
Scour critical (item 113): 7 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 5 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 110 10.05 Km over Culebrinas River | open | 1955 | 9,000 | September 2024 | Poor |
| Off Pr 110 10.5 Km over Creek | open | 1965 | 3,600 | May 2024 | Good |
| Off Pr 110 10.7 Km over Creek | open on a temporary structure | 1965 | 3,600 | May 2024 | Good |
| Off Pr 110 over Unknown Creek | open | 1996 | 600 | November 2024 | Fair |
| Pr 404 over Culebrinas River | open on a temporary structure | 1953 | 600 | May 2023 | Poor |
| Pr 404 over Culebrinas River | open | 1953 | 600 | May 2023 | Good |
| Pr 404 over Yagruma Creek | open | 1981 | 100 | June 2023 | Fair |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 404 over Culebrinas River | open on a temporary structure | 1953 | 600 | May 2023 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 110 10.05 Km over Culebrinas River | 1955 | 9,000 | Poor |
| Pr 110R 1.2 Km over Pr 111 4.4 Km | 1970 | 3,600 | Poor |
| Pr 404 over Culebrinas River | 1953 | 600 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr-111 over Stream | 1901 | 17,300 | Good |
| Pr 110 10.05 Km over Culebrinas River | 1955 | 9,000 | Poor |
| Pr 125 4.6 Km over Grande Creek | 1921 | 4,800 | Fair |
| Pr 110R 1.2 Km over Pr 111 4.4 Km | 1970 | 3,600 | Poor |
| Off Pr 110 10.7 Km over Creek | 1965 | 3,600 | Good |
| City St 2.05 Km over Waterway | 2009 | 3,600 | Fair |
| Off Pr 110 10.5 Km over Creek | 1965 | 3,600 | Good |
| Pr 423 over Grande Creek | 1986 | 1,800 | Fair |
| Pr 404 over Culebrinas River | 1953 | 600 | Poor |
| Off Pr 110 over Unknown Creek | 1996 | 600 | Fair |
Frequently asked questions
Are any bridges closed in Moca Municipio, Puerto Rico?
No bridges of the 15 in Moca Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 2 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Moca Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Moca Municipio: 1 bridge with a component rated 2 (critical) or lower, 3 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.
When were bridges in Moca Municipio last inspected?
Inspection dates in the 2025 inventory for Moca Municipio run from May 2023 to November 2024. Intervals: 4 on 12 months or less, 11 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Moca Municipio → - all 15, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.