BridgeReportCard
Home › Puerto Rico › Utuado Municipio › Pr 140 over Caonillas Dam

Pr 140 over Caonillas Dam

Utuado Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.27699, -66.65615)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck55Fair condition
Superstructure77Good condition
Substructure77Good condition

Bridge details

StructureSteel stringer or multi-beam girder
Lengthabout 214 ft
Location7.7 Km N E of Utuado
NBI structure number002951
Condition classFair
Traffic status (item 41)Posted for load
Last inspection (item 90)March 2023
Inspection interval (item 91)24 months
Scour (item 113)8: foundations stable, scour above the top of the footing

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Utuado Municipio

BridgeBuiltVehicles/dayCondition
Pr 123 55.6 Km over Grande De Arecibo River198030,800Good
Pr 111R 2.1 Km over Matadero Creek192528,500Fair
Off Pr 111R 2.2 Km over Matadero Creek201128,500Fair
Pr 123 62.5 Km over Waterway194016,400Fair
Pr 111 60.8 Km over Grande De Arecibo River196514,500Fair
Pr 10 52 Km over PR 621 3.5 KM & JOBS199011,300Fair

All bridges nearby: Utuado Municipio, PR bridge conditions · every bridge in Utuado Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.