Rural Local Road over Grande De Arecibo River
Utuado Municipio, Puerto Rico · rated Poor in the 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
- Rural Local Road over Grande De Arecibo River in Utuado Municipio, Puerto Rico, is rated in poor condition in the 2025 National Bridge Inventory (as of ).
- Its lowest-rated component is the deck, rated 0 (failed condition, out of service) on the 0-9 scale.
- It was built in 1973, making it 52 years old at the 2025 inventory.
- It carries about 250 vehicles a day (traffic count year 2005).
- Its listed owner is a city or municipal highway agency.
- It is one of 14 of the 59 inventoried bridges in Utuado Municipio rated poor (23.7%); 14 (23.7%) are rated poor.
- A poor rating means at least one major component - deck, superstructure, or substructure - is rated 4 or lower on FHWA's 0-9 scale. It does not by itself mean the bridge is unsafe; bridges judged unsafe are closed or load-restricted by their owners.
View this bridge on a map → (18.30108, -66.69826)
Component ratings
| Component | Rating (2025) | FHWA scale meaning |
|---|---|---|
| Deck | 0 | Failed condition, out of service |
| Superstructure | 0 | Failed condition, out of service |
| Substructure | 0 | Failed condition, out of service |
Bridge details
| Structure | Prestressed concrete stringer or multi-beam girder |
| Length | about 230 ft |
| Location | 5 Km North East of Utuado |
| NBI structure number | 014991 |
| Condition class | Poor |
Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.
Busiest bridges in Utuado Municipio
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 123 55.6 Km over Grande De Arecibo River | 1980 | 30,800 | Good |
| Pr 111R 2.1 Km over Matadero Creek | 1925 | 28,500 | Fair |
| Off Pr 111R 2.2 Km over Matadero Creek | 2011 | 28,500 | Fair |
| Pr 123 62.5 Km over Waterway | 1940 | 16,400 | Fair |
| Pr 111 60.8 Km over Grande De Arecibo River | 1965 | 14,500 | Fair |
| Pr 10 52 Km over PR 621 3.5 KM & JOBS | 1990 | 11,300 | Fair |
All bridges nearby: Utuado Municipio, PR bridge conditions · every bridge in Utuado Municipio · Puerto Rico bridges.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.