Pr 603 over Grande De Arecibo River
Utuado Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
- Pr 603 over Grande De Arecibo River in Utuado Municipio, Puerto Rico, is rated in fair condition in the 2025 National Bridge Inventory (as of ).
- Its lowest-rated component is the superstructure, rated 5 (fair condition) on the 0-9 scale.
- It was built in 1947, making it 78 years old at the 2025 inventory.
- It carries about 100 vehicles a day (traffic count year 2017).
- Its listed owner is the state highway agency.
- It is one of 35 of the 59 inventoried bridges in Utuado Municipio rated fair (59.3%); 14 (23.7%) are rated poor.
- Its traffic status in the 2025 inventory is open, no restriction (NBI item 41).
- It does not appear under this structure number in the 2024 inventory (a new or renumbered structure).
- Its most recent inspection on record is dated February 2024, on a 24-month routine inspection cycle.
- It is coded scour critical (NBI item 113 = 3): scour critical: foundations unstable for the assessed or calculated scour.
- A fair rating means the lowest-rated major component scores 5 or 6 on FHWA's 0-9 scale: some deterioration or minor section loss, but the structure is sound. It is the middle class, not a warning.
View this bridge on a map → (18.2598, -66.72223)
Component ratings
| Component | Rating (2025) | FHWA scale meaning |
|---|---|---|
| Deck | 8 | Very good condition |
| Superstructure | 5 | Fair condition |
| Substructure | 8 | Very good condition |
Bridge details
| Length | about 144 ft |
| Location | 0.07 Km From Int Pr 10 |
| NBI structure number | E05051 |
| Condition class | Fair |
| Traffic status (item 41) | Open, no restriction |
| Last inspection (item 90) | February 2024 |
| Inspection interval (item 91) | 24 months |
| Scour (item 113) | 3: scour critical: foundations unstable for the assessed or calculated scour |
Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.
Busiest bridges in Utuado Municipio
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 123 55.6 Km over Grande De Arecibo River | 1980 | 30,800 | Good |
| Pr 111R 2.1 Km over Matadero Creek | 1925 | 28,500 | Fair |
| Off Pr 111R 2.2 Km over Matadero Creek | 2011 | 28,500 | Fair |
| Pr 123 62.5 Km over Waterway | 1940 | 16,400 | Fair |
| Pr 111 60.8 Km over Grande De Arecibo River | 1965 | 14,500 | Fair |
| Pr 10 52 Km over PR 621 3.5 KM & JOBS | 1990 | 11,300 | Fair |
All bridges nearby: Utuado Municipio, PR bridge conditions · every bridge in Utuado Municipio · Puerto Rico bridges.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.