Pr 2 173.6 Km over Cain River
San Germán Municipio, Puerto Rico · rated Poor in the 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
- Pr 2 173.6 Km over Cain River in San Germán Municipio, Puerto Rico, is rated in poor condition in the 2025 National Bridge Inventory (as of ).
- Its lowest-rated component is the substructure, rated 4 (poor condition) on the 0-9 scale.
- It was built in 1964, making it 61 years old at the 2025 inventory.
- It carries about 38,000 vehicles a day (traffic count year 2017).
- Its listed owner is the state highway agency.
- It is one of 9 of the 47 inventoried bridges in San Germán Municipio rated poor (19.1%); 9 (19.1%) are rated poor.
- Its traffic status in the 2025 inventory is open, no restriction (NBI item 41).
- Its condition class and component ratings are unchanged from the 2024 inventory.
- Its most recent inspection on record is dated February 2024, on a 12-month routine inspection cycle.
- A poor rating means at least one major component - deck, superstructure, or substructure - is rated 4 or lower on FHWA's 0-9 scale. It does not by itself mean the bridge is unsafe; bridges judged unsafe are closed or load-restricted by their owners.
View this bridge on a map → (18.09802, -67.03994)
Component ratings
| Component | Rating (2024) | Rating (2025) | FHWA scale meaning |
|---|---|---|---|
| Deck | 5 | 5 | Fair condition |
| Superstructure | 6 | 6 | Satisfactory condition |
| Substructure | 4 | 4 | Poor condition |
Bridge details
| Structure | Continuous concrete tee beam |
| Length | about 185 ft |
| Location | 1.8 Km North San German |
| NBI structure number | 007921 |
| Condition class | Poor |
| Traffic status (item 41) | Open, no restriction |
| Last inspection (item 90) | February 2024 |
| Inspection interval (item 91) | 12 months |
| Scour (item 113) | 4: foundations stable, field review says exposed foundations need protection |
Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.
Busiest bridges in San Germán Municipio
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 2 over Toruno Creek | 1964 | 38,000 | Good |
| Pr 2 174.1 Km over Hosp Concepsion Access | 2010 | 38,000 | Good |
| Pr 2 168.9 Km over Duey River | 2010 | 35,000 | Fair |
| Pr 2 178.0 Km over Cupeyes River | 1964 | 32,900 | Fair |
| Pr 2 179.5 Km over Local Road | 1972 | 32,900 | Good |
| Pr 2 175.1 Km over Pr 122 0.2 Km | 2014 | 32,900 | Fair |
All bridges nearby: San Germán Municipio, PR bridge conditions · every bridge in San Germán Municipio · Puerto Rico bridges.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.