Bridge conditions in San Germán Municipio, Puerto Rico
47 inventoried bridges · 1 closed · 15 posted · 9 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 47 bridges (1 without coordinates in the inventory is not shown).
San Germán Municipio has 9 bridges rated poor out of 47 inventoried, a 19.1% share that puts it well above the national rate of about 7%.
- 9 of the 47 bridges in San Germán Municipio, Puerto Rico, are rated in poor condition (19.1%) in the 2025 National Bridge Inventory, as of .
- San Germán Municipio has 1 bridge closed to all traffic and 15 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 5 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; 5 bridges had at least one major component rating lowered.
- 2 bridges have a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from February 2023 to December 2024; 15 bridges over water are coded scour critical.
- 12 bridges (25.5%) are rated good and 26 (55.3%) fair.
- The median San Germán Municipio bridge was built in 1976.
- The busiest poor-rated bridge is Pr 2 173.6 Km over Cain River (built 1964), carrying about 38,000 vehicles a day.
What this page is: the federal bridge inspection inventory for San Germán Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 25.5% · Fair 55.3% · Poor 19.1% of 47 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 2 175.1 Km over Pr 122 0.2 Km | good to fair; deck 8 to 6 | Good | Fair | 32,900 |
| Rmp Pr 330 0.01 Km over Pr 2 168.4 Km | good to fair; substructure 7 to 6 | Good | Fair | 3,600 |
| Pr 3363 over Pr 2 | superstructure 6 to 5 | Fair | Fair | 100 |
| Pr 2 178.0 Km over Cupeyes River | deck 7 to 6 | Fair | Fair | 32,900 |
| Pr 2 174.1 Km over Hosp Concepsion Access | superstructure 8 to 7 | Good | Good | 38,000 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 102 28.6 Km over Mercado Creek | load posting removed | Poor | Poor | 14,600 |
| Pr 114 12.1 Km over Viejo River | load posting removed | Fair | Fair | 12,700 |
| Pr 330 over Unknown Creek | load posting removed | Good | Good | 1,800 |
2 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Anslm SR St Km 1.2 over Brujo River | closed | 2002 | 8,500 | February 2024 | Poor |
| Pr 318 over Maresua Creek | posted for load | 1948 | 9,000 | May 2023 | Fair |
| Pr 119 over Nueve Pasos River | posted for load | 1929 | 5,800 | March 2023 | Fair |
| Off Pr 330 0.05 Km over Duey River | posted for load | 1984 | 3,600 | November 2023 | Fair |
| Off Pr 330 Km 1.55 over Duey River | posted for load | 1949 | 3,600 | July 2024 | Fair |
| Pr 314 over Mercado Creek | posted for load | 1949 | 1,600 | May 2023 | Fair |
| Pr 347 over Guanajibo River | posted for load | 1953 | 1,100 | June 2023 | Fair |
| Pr 362 over Toruno Creek | posted for load | 1950 | 1,000 | May 2023 | Fair |
| Off Pr 348 12.6 Km over Nueve Pasos River | posted for load | 1984 | 600 | May 2024 | Fair |
| Pr 348 12.4 Km over Los Vazquez Creek | posted for load | 1950 | 600 | February 2023 | Fair |
| Pr 348 17.2 Km over Nueve Pasos River | posted for load | 1959 | 600 | May 2024 | Poor |
| Pr 329 over Pancholo Creek | posted for load | 1940 | 500 | May 2023 | Fair |
| Pr 329 over Railroad Track | posted for load | 1940 | 500 | March 2023 | Fair |
| Off Pr 361 at 4.2 over Cain River | posted for load | 1993 | 400 | March 2023 | Fair |
| Off Pr 361 at 4.4 over Cain River | posted for load | 2000 | 400 | March 2023 | Good |
| Off Pr 393 Km 0.03 over Duey River | posted for load | 1990 | 400 | September 2024 | Poor |
| Pr 102 28.6 Km over Mercado Creek | open, posting recommended | 1952 | 14,600 | August 2024 | Poor |
| Pr 114 12.1 Km over Viejo River | open, posting recommended | 1932 | 12,700 | July 2024 | Fair |
| Pr 330 over Unknown Creek | open, posting recommended | 1960 | 1,800 | August 2023 | Good |
| Pr 358 over Hoconuco River | open on a temporary structure | 1978 | 1,000 | March 2023 | Poor |
| Off Pr 330 over Duey River | open on a temporary structure | 1976 | 250 | November 2023 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 12 on 12 months or less, 35 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in San Germán Municipio is dated December 2024; 21 bridges have an inspection dated in 2024.
Scour critical (item 113): 15 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 5 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| PR102 over Guanajibo River | open | 1998 | 15,600 | May 2023 | Fair |
| Pr 102 28.6 Km over Mercado Creek | open, posting recommended | 1952 | 14,600 | August 2024 | Poor |
| Pr 114 10.1 Km over Guanajibo River | open | 1989 | 12,700 | September 2024 | Fair |
| Pr 102 36.0 Km over Guanajibo River | open | 1969 | 11,300 | March 2024 | Poor |
| Pr 360 over Guanajibo River | open | 1978 | 8,600 | June 2023 | Fair |
| Anslm SR St Km 1.2 over Brujo River | closed | 2002 | 8,500 | February 2024 | Poor |
| Pr 119 over Nueve Pasos River | posted for load | 1929 | 5,800 | March 2023 | Fair |
| Off Pr 330 Km 1.55 over Duey River | posted for load | 1949 | 3,600 | July 2024 | Fair |
| Pr 358 over Hoconuco River | open on a temporary structure | 1978 | 1,000 | March 2023 | Poor |
| Pr 358 over Hoconuco River | open | 1978 | 1,000 | March 2023 | Good |
| Pr 362 over Toruno Creek | posted for load | 1950 | 1,000 | May 2023 | Fair |
| Off Pr 348 12.6 Km over Nueve Pasos River | posted for load | 1984 | 600 | May 2024 | Fair |
| Pr 348 17.2 Km over Nueve Pasos River | posted for load | 1959 | 600 | May 2024 | Poor |
| Off Pr 361 at 4.4 over Cain River | posted for load | 2000 | 400 | March 2023 | Good |
| Off Pr 330 over Duey River | open on a temporary structure | 1976 | 250 | November 2023 | Poor |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 358 over Hoconuco River | open on a temporary structure | 1978 | 1,000 | March 2023 | Poor |
| Off Pr 330 over Duey River | open on a temporary structure | 1976 | 250 | November 2023 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 2 173.6 Km over Cain River | 1964 | 38,000 | Poor |
| Pr 102 28.6 Km over Mercado Creek | 1952 | 14,600 | Poor |
| Pr 102 36.0 Km over Guanajibo River | 1969 | 11,300 | Poor |
| Anslm SR St Km 1.2 over Brujo River | 2002 | 8,500 | Poor |
| Pr 119 75.7 Km over Hoconuco River | 1927 | 3,600 | Poor |
| Pr 358 over Hoconuco River | 1978 | 1,000 | Poor |
| Pr 348 17.2 Km over Nueve Pasos River | 1959 | 600 | Poor |
| Off Pr 393 Km 0.03 over Duey River | 1990 | 400 | Poor |
| Off Pr 330 over Duey River | 1976 | 250 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 2 173.6 Km over Cain River | 1964 | 38,000 | Poor |
| Pr 2 over Toruno Creek | 1964 | 38,000 | Good |
| Pr 2 174.1 Km over Hosp Concepsion Access | 2010 | 38,000 | Good |
| Pr 2 168.9 Km over Duey River | 2010 | 35,000 | Fair |
| Pr 2 178.0 Km over Cupeyes River | 1964 | 32,900 | Fair |
| Pr 2 179.5 Km over Local Road | 1972 | 32,900 | Good |
| Pr 2 175.1 Km over Pr 122 0.2 Km | 2014 | 32,900 | Fair |
| Pr-122 over Guanajibo River | 2014 | 25,400 | Good |
| Pr 102 Pr 329 2 Km over Rio Guanajibo | 2005 | 17,900 | Fair |
| PR102 over Guanajibo River | 1998 | 15,600 | Fair |
Frequently asked questions
Are any bridges closed in San Germán Municipio, Puerto Rico?
1 bridge of the 47 in San Germán Municipio is coded closed to all traffic in the 2025 National Bridge Inventory, and 15 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in San Germán Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for San Germán Municipio: 2 bridges with a component rated 2 (critical) or lower, 9 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in San Germán Municipio last inspected?
Inspection dates in the 2025 inventory for San Germán Municipio run from February 2023 to December 2024. Intervals: 12 on 12 months or less, 35 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in San Germán Municipio → - all 47, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.