BridgeReportCard
Home › Puerto Rico › San Germán Municipio › Pr 2 over Toruno Creek

Pr 2 over Toruno Creek

San Germán Municipio, Puerto Rico · rated Good in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.09687, -67.0377)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Culvert77Good condition

Bridge details

StructureConcrete culvert
Lengthabout 220 ft
Location1.5 Km North San German
NBI structure number007931
Condition classGood
Traffic status (item 41)Open, no restriction
Last inspection (item 90)March 2023
Inspection interval (item 91)24 months
Scour (item 113)8: foundations stable, scour above the top of the footing

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in San Germán Municipio

BridgeBuiltVehicles/dayCondition
Pr 2 173.6 Km over Cain River196438,000Poor
Pr 2 174.1 Km over Hosp Concepsion Access201038,000Good
Pr 2 168.9 Km over Duey River201035,000Fair
Pr 2 178.0 Km over Cupeyes River196432,900Fair
Pr 2 179.5 Km over Local Road197232,900Good
Pr 2 175.1 Km over Pr 122 0.2 Km201432,900Fair

All bridges nearby: San Germán Municipio, PR bridge conditions · every bridge in San Germán Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.