BridgeReportCard
HomePuerto RicoSan Germán Municipio › Pr 2 174.1 Km over Hosp Concepsion Acces

Pr 2 174.1 Km over Hosp Concepsion Access

San Germán Municipio, Puerto Rico · rated Good in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.09613, -67.03641)

Component ratings

ComponentRating (2025)FHWA scale meaning
Deck7Good condition
Superstructure7Good condition
Substructure7Good condition

Bridge details

StructureConcrete girder and floorbeam
Lengthabout 123 ft
Location2KM NW of Sgerman Urban
NBI structure number028991
Condition classGood

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in San Germán Municipio

BridgeBuiltVehicles/dayCondition
Pr 2 173.6 Km over Cain River196438,000Poor
Pr 2 over Toruno Creek196438,000Good
Pr 2 168.9 Km over Duey River201035,000Fair
Pr 2 178.0 Km over Cupeyes River196432,900Fair
Pr 2 179.5 Km over Local Road197232,900Good
Pr 2 175.1 Km over Pr 122 0.2 Km201432,900Fair

All bridges nearby: San Germán Municipio, PR bridge conditions · every bridge in San Germán Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.