BridgeReportCard
Home › Puerto Rico › San Germán Municipio › Rural Local Road over Pr 2

Rural Local Road over Pr 2

San Germán Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.08099, -66.98765)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck55Fair condition
Superstructure77Good condition
Substructure66Satisfactory condition

Bridge details

StructurePrestressed concrete stringer or multi-beam girder
Lengthabout 146 ft
Location3 Km West Sabana Grande
NBI structure number009651
Condition classFair
Traffic status (item 41)Open, no restriction
Last inspection (item 90)March 2023
Inspection interval (item 91)24 months
Scour (item 113)N: not over a waterway

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in San Germán Municipio

BridgeBuiltVehicles/dayCondition
Pr 2 173.6 Km over Cain River196438,000Poor
Pr 2 over Toruno Creek196438,000Good
Pr 2 174.1 Km over Hosp Concepsion Access201038,000Good
Pr 2 168.9 Km over Duey River201035,000Fair
Pr 2 178.0 Km over Cupeyes River196432,900Fair
Pr 2 179.5 Km over Local Road197232,900Good

All bridges nearby: San Germán Municipio, PR bridge conditions · every bridge in San Germán Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.