BridgeReportCard
Home › Puerto Rico › San Germán Municipio › Pr 119 over Pr 2

Pr 119 over Pr 2

San Germán Municipio, Puerto Rico · rated Good in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.10056, -67.04573)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck77Good condition
Superstructure88Very good condition
Substructure77Good condition

Bridge details

StructurePrestressed concrete stringer or multi-beam girder
Lengthabout 236 ft
Location2.02 Km. NW. of S. German
NBI structure number029001
Condition classGood
Traffic status (item 41)Open, no restriction
Last inspection (item 90)September 2023
Inspection interval (item 91)24 months
Scour (item 113)N: not over a waterway

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in San Germán Municipio

BridgeBuiltVehicles/dayCondition
Pr 2 173.6 Km over Cain River196438,000Poor
Pr 2 over Toruno Creek196438,000Good
Pr 2 174.1 Km over Hosp Concepsion Access201038,000Good
Pr 2 168.9 Km over Duey River201035,000Fair
Pr 2 178.0 Km over Cupeyes River196432,900Fair
Pr 2 179.5 Km over Local Road197232,900Good

All bridges nearby: San Germán Municipio, PR bridge conditions · every bridge in San Germán Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.