BridgeReportCard
Home › Puerto Rico › San Germán Municipio › Pr 358 over Hoconuco River

Pr 358 over Hoconuco River

San Germán Municipio, Puerto Rico · rated Good in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.11634, -67.05856)

Component ratings

ComponentRating (2025)FHWA scale meaning
Deck8Very good condition
Superstructure7Good condition
Substructure8Very good condition

Bridge details

Lengthabout 61 ft
Location2 KM N OF INT PR2 & P
NBI structure numberE17281
Condition classGood
Traffic status (item 41)Open, no restriction
Last inspection (item 90)March 2023
Inspection interval (item 91)24 months
Scour (item 113)3: scour critical: foundations unstable for the assessed or calculated scour
Fracture critical (item 92A)Yes

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in San Germán Municipio

BridgeBuiltVehicles/dayCondition
Pr 2 173.6 Km over Cain River196438,000Poor
Pr 2 over Toruno Creek196438,000Good
Pr 2 174.1 Km over Hosp Concepsion Access201038,000Good
Pr 2 168.9 Km over Duey River201035,000Fair
Pr 2 178.0 Km over Cupeyes River196432,900Fair
Pr 2 179.5 Km over Local Road197232,900Good

All bridges nearby: San Germán Municipio, PR bridge conditions · every bridge in San Germán Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.